Sun City Station #47
Project: Sun City Station #47
Hillsborough County, Florida
Location: 14495 Sout US Hwy 301
Ruskin, FL 33573
Bids Due: April 10, 2025 @ 2:00pm (Thursday)
Submit to: Construction Technology Group, Inc.
Tammy Burton
For questions and Inquiries about the project please email us at: Tammy Burton
Hillsborough County, Florida
Location: 14495 Sout US Hwy 301
Ruskin, FL 33573
Bids Due: April 10, 2025 @ 2:00pm (Thursday)
Submit to: Construction Technology Group, Inc.
Tammy Burton
For questions and Inquiries about the project please email us at: Tammy Burton
Project Description
Construct a new 2-Bay fire station approximately 7,327 sq. ft. The work includes but is not limited to all associated on-site and off-site improvements such as access drives, parking lot, dumpster enclosure, sign, flagpole, landscaping, irrigation, storm drainage system, sidewalks, fences, refueling facility, and all necessary utilities including lift station with force main and water main with jack and bore under Hwy 301, plus a back-up generator, concrete/masonry, cabinetry, wood trusses, cement board lap siding, epoxy floor, shingles roofing, doors and hardware, impact rated glass and glazing, impacted rated overhead doors, interior finishes, specialties, fire sprinkler system, Fire Alerting System, plumbing, HVAC and electrical.
Important Notes:
Construct a new 2-Bay fire station approximately 7,327 sq. ft. The work includes but is not limited to all associated on-site and off-site improvements such as access drives, parking lot, dumpster enclosure, sign, flagpole, landscaping, irrigation, storm drainage system, sidewalks, fences, refueling facility, and all necessary utilities including lift station with force main and water main with jack and bore under Hwy 301, plus a back-up generator, concrete/masonry, cabinetry, wood trusses, cement board lap siding, epoxy floor, shingles roofing, doors and hardware, impact rated glass and glazing, impacted rated overhead doors, interior finishes, specialties, fire sprinkler system, Fire Alerting System, plumbing, HVAC and electrical.
Important Notes:
- DM/DWBE participation of 17%.
- Compliance with the US Homeland Security E-Verify System.
- Alternates (Spec Section 010300): There are 4 Alternates. Please review carefully.
- Schedule is 330 calendar days to substantial completion with liquidated damages.
Construction Technology Group is an equal opportunity employer and encourages DM/DWBE participation.
Project Name |
Date Added |
02/10/2025 |
|
02/10/2025 |
|
02/10/2025 |
|
02/10/2025 |
|
02/10/2025 |
|
02/10/2025 |
|
03/21/2025 |
|
03/31/2025 |
|
04/01/2025 |