IR Procedure Room - Interior Alterations
Project: IR Procedure Room - Interior Alterations
Location: Nuvance Health - Norwalk Hospital
34 Maple Street
Norwalk, CT 06850
Bids Due: September 19, 2024 @ 3:00pm (Thursday)
Submit to: Construction Technology Group, Inc.
Gary Brockman
For questions and Inquiries about the project please email us at: Gary Brockman
Location: Nuvance Health - Norwalk Hospital
34 Maple Street
Norwalk, CT 06850
Bids Due: September 19, 2024 @ 3:00pm (Thursday)
Submit to: Construction Technology Group, Inc.
Gary Brockman
For questions and Inquiries about the project please email us at: Gary Brockman
Project Description
Interior alterations for an IR Procedure Room on the 3rd floor approximately 1,185 sf. Work to include but not limited to infection control measures, temporary partitions, selective interior demolition, structural steel overhead support, new unistrut supports, cabinetry with solid surface countertops, doors and hardware, drywall, ACT, LVT flooring, epoxy flooring, painting, corner guards, lead glass and lead lined hollow metal frames, lead shielded wood doors, lead lined drywall, fire sprinklers, medical gases, plumbing, mechanical, and electrical.
Important Notes:
Interior alterations for an IR Procedure Room on the 3rd floor approximately 1,185 sf. Work to include but not limited to infection control measures, temporary partitions, selective interior demolition, structural steel overhead support, new unistrut supports, cabinetry with solid surface countertops, doors and hardware, drywall, ACT, LVT flooring, epoxy flooring, painting, corner guards, lead glass and lead lined hollow metal frames, lead shielded wood doors, lead lined drywall, fire sprinklers, medical gases, plumbing, mechanical, and electrical.
Important Notes:
- Forward any RFI’s/Questions by Friday, August 23, 2024.
- Alternates are noted on the drawings. Spreadsheet forth coming.
- Anticipated construction start date is October 15, 2024, with final completion, turned over for Owner’s use no later than April 15, 2025. All proposals shall include off hour work and overtime as necessary to meet this deadline.
- Subcontractors are responsible for individual permits, inspections, and signoffs.
- Subcontractors are to comply with the Nuvance Health Life Safety and Infectious Control Standards.
- Subcontractors are to comply with Nuvance Health policies and procedures and shall take all necessary precautions so not to interfere with the hospitals 24-hour, 7 day a week operation. Staff and patient safety are a priority.
Construction Technology Group is an equal opportunity employer and encourages Dm/DWBE participation.
Project Name |
Date Added |
08/06/2024 |
|
08/06/2024 |
|
08/06/2024 |
|
08/06/2024 |
|
09/04/2024 |
|
09/04/2024 |